- Jurisdiction
- Washington
I moved into low income appartments in january.
Had an issue with mold that took a long time to fix.
About 2 months after started having problems with plumbing
After multiple attempts to clean it with draino and snake they kept saying that problem is fixed but it wasnt
Eventually sink and washer drain started overflowing and flooding the kitchen and bathroom multiple times.
after about 4 months of dragging their feet they attempted to fix it and opened the floor. Which didnt fix the issue.
Flooding got More frequent.
After another 2 months and multiple "inspections" they said they need to open the floor again to fix the problem.
last thursday they tried to schedule the repair again for this week when i have custody of my kid, i told them they need to stop scheduling it for when i have my kid.
So they scheduled it for last friday and the job was supposed to be done on saturday morning. But the construction crew were off for the weekend and i got locked out of my unit.
today (monday) they were supposed to finish but they showed up in the afternoon and said that it needs more work so im still locked out.
And now im getting a runaround about when it will be done.
I have just found out that sewer gasses are toxic and i have been smelling sewer gasses for at least 6 months.
i cant move until my divorce is finalized which is soon.
im not sure what the best way to handle this situation
Had an issue with mold that took a long time to fix.
About 2 months after started having problems with plumbing
After multiple attempts to clean it with draino and snake they kept saying that problem is fixed but it wasnt
Eventually sink and washer drain started overflowing and flooding the kitchen and bathroom multiple times.
after about 4 months of dragging their feet they attempted to fix it and opened the floor. Which didnt fix the issue.
Flooding got More frequent.
After another 2 months and multiple "inspections" they said they need to open the floor again to fix the problem.
last thursday they tried to schedule the repair again for this week when i have custody of my kid, i told them they need to stop scheduling it for when i have my kid.
So they scheduled it for last friday and the job was supposed to be done on saturday morning. But the construction crew were off for the weekend and i got locked out of my unit.
today (monday) they were supposed to finish but they showed up in the afternoon and said that it needs more work so im still locked out.
And now im getting a runaround about when it will be done.
I have just found out that sewer gasses are toxic and i have been smelling sewer gasses for at least 6 months.
i cant move until my divorce is finalized which is soon.
im not sure what the best way to handle this situation