I hired a contractor to re-glaze all the windows on my house, when he initially arrived he shot me a bid of $1000 for all the windows, I agreed and signed the document with my intials. He did not give me a copy of the contract until later. He gets 3/4 of the way through the job and says there's more windows than he thought and said he only agreed to re-glaze 9 of them.
Long story short the cops were called, he was asked to leave my property with his equipment, and something was put on file with the police department. This is when i get the contract, a modified version, he specifically added 9 to the contract after the fact. Although I can't prove it.
My expectations for his work were not met at all, I'm currently waiting on a city inspector to look at his work. That's the whole reason I went down this rabbit hole of even hiring someone. Do I even have a case ?
I had the expectation of a smooth transition from the glazing to the window, it looks terrible in my opinion and I don't think 1000 dollars is a justified price for the quality of work.
Long story short the cops were called, he was asked to leave my property with his equipment, and something was put on file with the police department. This is when i get the contract, a modified version, he specifically added 9 to the contract after the fact. Although I can't prove it.
My expectations for his work were not met at all, I'm currently waiting on a city inspector to look at his work. That's the whole reason I went down this rabbit hole of even hiring someone. Do I even have a case ?
I had the expectation of a smooth transition from the glazing to the window, it looks terrible in my opinion and I don't think 1000 dollars is a justified price for the quality of work.