Search results

  1. R

    Work not done to specifications

    We hired a contractor to build a tornado/wine cellar. Specifications were at least 3' of dirt over top and all sides. Top of the shelter has 6 inches of dirt at the front and 16 inches in the middle. Structure is 10 x 10. There was also supposed to be a vent for air exchange. No vent was...
Back
Top